Residential.
Tapton Lock, Chesterfield
Contact us: 0114 478 3709 | hello@vformconstruction.com | online [+]
Unique service
- Full Turnkey Service for Investor Clients – from project inception to completion.
- Early Contractor involvement with Design Team, resolved design technical queries promptly, provided buildable solutions and an early start on site.
- Prepare and agree design and remediation method statement with The Environmental Agency to build over a reclaimed site.
- The liason with Ministry of Defence to safely remove unexploaded ordnance
- Liason with adjacent land owners that inlcuded the East Coast Main Railway Line, Chesterfield Canal and Premier Inn Hotel.
- Liason with Police to agree “Secure by Design” details and on site approval.
Project highlights
-
Duration:
18 Months
-
Form of Contract:
JCT Design & Build
-
Value:
£4,950,000
Scope of work
- Site remediation and piling works.
- New build construction of 80 Nr 2 bedroom flats in 5 separate blocks.
- External hard and soft landscaped drives, footpaths and gardens.
- 50m Canal-side mooring and retaining walls.
- Road & footpaths to adoptable highway standards.
- Offsite foul, surface water drainage and attenuation design and installation to Statutory Authority standards.
- Agree design standards and carry out regular site inspections with Zurich Building Warranty.
- Acted as the Employer’s representative with all project stakeholders including bank funders, legal advisers, mains services installers, Local Authority departments, Statutory Authorities and Designers.